Customization: | Available |
---|---|
Material: | PE |
Hardness: | Hoses |
Still deciding? Get samples of US$ 0.01/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Features:
Good tension resistance;
Uniform water spraying;
Customized punching style;
High installation efficiency short construction period low cost easy disassembly and removal for irrigation;
Plentirain Rain Tape adopts advanced laser punching technology.
Water must be clean. Screen filter with over 60 mesh can be bound to water pump inlet, if necessary, to stop impurities.
The tape should be laid around the slope on the hilly farm, instead of along with the slope. It should not be dragged to scratch the tape.
More valves shall be opened in first use. Valves shoule be turned up and down according to the irrigation pressure, so that the tape can not be burst due to too big pressure.
S/N | Model | Width (mm) | Dia. (mm) | Wall thick (mm) | Holes punched qty/set | Hole set spacing (cm) | Hole dia. | Flow rate (m³/hr/10m) |
Max. running length (m) | Spray range at two sides | Working pressure (bar) | Roll length (m) | Caron size(cm) | Rolls/ ctn |
1 | PRSTN2002 | 32 | 20 | 0.2 | 2/3/5/7/9 | 10-40 | 0.6-0.8mm | 0.7 | 20 | 1.25m each side | 0.2-0.8 | 200 | 36*36*33 | 7 |
2 | PRSTN2502 | 40 | 25 | 0.2 | 2/3/5/7/9 | 10-40 | 0.6-0.8mm | 0.9 | 25 | 1.5m each side | 0.2-0.8 | 200 | 36*36*27 | 5 |
3 | PRSTN2503 | 40 | 25 | 0.3 | 2/3/5/7/9 | 10-40 | 0.6-0.8mm | 0.9 | 25 | 1.5m each side | 0.2-0.8 | 100 | 33*33*36 | 7 |
4 | PRSTN2802 | 45 | 28 | 0.2 | 2/3/5/7/9 | 10-40 | 0.6-0.8mm | 1.4 | 30 | 1.75m each side | 0.2-0.8 | 200 | 36*36*33 | 6 |
5 | PRSTN3202 | 50 | 32 | 0.2 | 2/3/5/7/9 | 10-40 | 0.6-0.8mm | 1.55 | 50 | 2m each side | 0.2-0.8 | 200 | 36*36*33 | 5 |
6 | PRSTN3203 | 50 | 32 | 0.3 | 2/3/5/7/9 | 10-40 | 0.6-0.8mm | 1.55 | 50 | 2m each side | 0.2-0.8 | 100 | 33*33*36 | 6 |
7 | PRSTN4002 | 63 | 40 | 0.2 | 2/3/5/7/9 | 10-40 | 0.6-0.8mm | 1.6 | 60 | 2.5m each side | 0.2-0.8 | 200 | 36*36*33 | 4 |
8 | PRSTN4003 | 63 | 40 | 0.3 | 2/3/5/7/9 | 10-40 | 0.6-0.8mm | 1.6 | 60 | 2.5m each side | 0.2-0.8 | 100 | 33*33*36 | 5 |
9 | PRSTN4004 | 63 | 40 | 0.4 | 2/3/5/7/9 | 10-40 | 0.6-0.8mm | 1.6 | 60 | 2.5m each side | 0.2-0.8 | 100 | 36*36*38 | 5 |
10 | PRSTN5003 | 80 | 50 | 0.3 | 2/3/5/7/9 | 10-40 | 0.6-0.8mm | 2.2 | 80 | 4m each side | 0.2-0.8 | 100 | 33*33*36 | 4 |
11 | PRSTN5004 | 80 | 50 | 0.4 | 2/3/5/7/9 | 10-40 | 0.6-0.8mm | 2.2 | 80 | 4m each side | 0.2-0.8 | 100 | 33*33*36 | 4 |
12 | PRSTN6303 | 100 | 63 | 0.3 | 2/3/5/7/9 | 10-40 | 0.6-0.8mm | 3.1 | 100 | 5m each side | 0.2-0.8 | 100 | 36*36*33 | 3 |
13 | PRSTN6304 | 100 | 63 | 0.4 | 2/3/5/7/9 | 10-40 | 0.6-0.8mm | 3.1 | 100 | 5m each side | 0.2-0.8 | 100 | 36*36*33 | 3 |
Are you a manufacturer? | Yes, our company has two factories.The Shijiazhuang factory specializes in producing pipe extrusion products such as drip tape, while the Foshan factory focuses on manufacturing plastic injection molding products like drip tape accessiories. |
Certification? | ISO9001:2015, Gold Plus Supplier Assessment, BV and SGS inspection. Other certification, such as SONCAP when ship to Nigeria, COC when ship to Morocco, etc. |
Delivery time? | Sample:1-7 days; LCL order: 7-15 days; FCL order: 15-20 days; OEM & ODM order: on a case-by-case basis. |
OEM and ODM service? | OEM and ODM are available. |
Payment terms? | The following payment methods are acceptable: 1.30% paid by T/T as deposit before the production, 70% paid by T/T as balance against scan copy of B/L. 2. 30% paid by T/T before the production, 70% paid by irrevocable L/C at sight. 3.30% paid by T/T as deposit before the production, 70% paid by T/T as balance before shipment. |