Customization: | Available |
---|---|
Material: | PE |
Hardness: | Hard |
Still deciding? Get samples of US$ 2/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
ITEM NO. | NAME AND SPECIFICATION | Bag Qty (Pc) | Quantity (Pcs/Ctn) | CARTON SIZE (CM) | G. weight per carton(kg) |
VB06 | Valve box 6'' Bottom dia:205mm Top dia:150mm Height:235 mm |
1 | 28 | 41*41*57 | 15.5 |
VB10 | Valve box 10'' Bottom dia:340mm Top dia:260mm Height:260 mm |
1 | 10 | 69*35.5*59 | 19 |
VB12 | Valve box 12'' Bottom length:525mm Bottom width:380mm Top length:425mm Top width:300mm Height: 305mm |
1 | 5 | 54.5*40.5*58.5 | 23 |
VB15 | Valve box 15'' Bottom length:690mm Bottom width:520mm Top length:550mm Top width:385mm Height: 310mm |
1 | 3 | 69.5*52*45 | 20 |
Are you a manufacturer? | Yes, our company has two factories. The Shijiazhuang factory produces pipe extrusion products such as drip tape, while the Foshan factory manufactures plastic injection molding products like drip tape accessories. |
Certification? | ISO9001:2015, Gold Plus Supplier Assessment, BV, and SGS inspection. Other certifications, such as SONCAP when shipping to Nigeria, COC when shipping to Morocco, etc. |
Delivery time? | Sample:1-7 days; LCL order: 7-15 days; FCL order: 15-20 days; OEM & ODM order: on a case-by-case basis. |
OEM and ODM service? | OEM and ODM are available. |
Payment terms? | The following payment methods are acceptable: 1.30% paid by T/T as a deposit before the production, and 70% paid by T/T as a balance against a scanned copy of B/L. 2. 30% paid by T/T before the production, 70% paid by irrevocable L/C at sight. 3.30% paid by T/T as deposit before the production, 70% paid by T/T as balance before shipment. |